Kedarnath Yatra: 15-Meter Path Washout at Chirbasa, Passengers Rescued Safely

The Kedarnath Yatra was disrupted after a 15-meter stretch of the Gaurikund-Kedarnath pedestrian path near Chirbasa was washed out, halting movement. Pedestrians were stranded for two hours before being safely rescued by NDRF, SDRF, and the Public Works Department (PWD), who created an alternative route for foot traffic. However, horse and mule operations remain suspended.

Read also:World Alzheimer’s Day 2024: Date, History, Significance, Key Facts, Theme, and Awareness

This route, previously damaged by heavy rains on July 31, continues to face challenges. Over 400 PWD workers are repairing the path, aiming to restore its original condition. Security measures are also being enhanced along the 16-kilometer stretch. Major repairs include constructing gavin walls, CC embankments, and culverts across rain streams and avalanche zones.

Read also:Anandeshwar Mandir Parmat Kanpur: A Detailed Guide on Timings, History, Aarti, and Location

The Ramabara area along the route is slated for a 70-meter Bailey bridge over the Mandakini River, which is currently served by a temporary iron bridge. The rescue and repair operations aim to ensure a safer journey for pilgrims as the Yatra progresses.

Read also :Tirupati Laddu Controversy: Rising concerns over Ghee quality in Dehradun markets

ये भी पढ़े:  CBI suspects bigger conspiracy in Kolkata rape-murder case, former principal and inspector in custody
Trishla Tyagi
Trishla Tyagi